In the test laboratory, all routine and type tests of Extreme Power Transformer from 25 kVA to 2500 kVA are performed with our high quality test equipment. In addition, special tests are performed according to the customer’s request. Our Test Laboratory aims to meet customer requests and expectations quickly and on time, and to produce reliable test results based on national standards, with trained and experienced test personnel, in suitable environmental conditions, using suitable devices and valid test methods. At the same time, in addition to protecting the confidentiality of customer information, it aims to continue all test services in line with the principles of impartiality and reliability, away from any kind of influence and pressure.
The tests defined below are applied to each transformer that has been completed in accordance with TS EN 60076-1 and IEC standards.
➤ Conversion ratio measurement and connection group determination
➤ Measurement of winding resistance
➤ Separately sourced a.c. withstand voltage test (Applied voltage test)
➤ Short-term induced a.c. voltage test (Induced voltage test)
➤ Measurement of no-load losses and no-load current
➤ Measurement of load losses and short circuit voltage
➤ Measurement of DC insulation resistance
➤ Pressure seal test
➤ Coating thickness measurement